RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

47 Users Online (46 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Community >> The Studio >> The BIM Blink

Search this ThreadSearch this Thread | Page 1 of 1 |

Wed, Apr 18, 2007 at 1:22:36 PM | The BIM Blink

#1

spatia3


active
spatia3 Avatar

Joined: Fri, Aug 25, 2006
7 Posts
5 Stars: 1 Votes


BIM - (Building Information Modeling), which combines the objectivity of progressive cad, also strategically offers the practice of four dimensionality (4D = 3D + time,) can generate queried databases, renders with striking photorealism, and allows for complete building sets to be executed in profoundly different ways from ordinary traditional and digital drafting. BIM technology incorporates a practical, egalitarian system by using parameterized tools as its foundation. These parametric objects, somewhat familiar to those using cad, are extensively more accessible and can be managed much more comfortably within the framework of BIM programs. However, BIM projects are often misunderstood.

The foundation of BIM is the use of objects in lieu of 3D drafting with vector based lines, which ultimately created forms, but which led to bulky sized 3D files that were hard to edit; in other words, non virtual, non sustainable 3D cad files. BIM erases this problem automatically. Because BIM objects are: built based on typical standardized divisions, have been pre-coordinated and packaged to contain all the necessary information common to a project with programmatic development. This containerization has served to address both commodity and nuanced element pertaining to the architecture being considered. Inside the container all programs are in a multiple stack as sequenced families. This sequence is subsequent to the research and development by that which the manufacturer stands behind. In essence, think of the BIM model, already having the shop drawing information built in as per the manufactured unit, system, or type, and can be augmented by the designer based on future determined points. Of course this applies when only those manufacturers producing BIM objects are involved with the BIM data they represent. It has to come from BIM, first hand to truly represent.

With BIM technology, the exploration of interstitial, aggregate space is performed in ways quite varied from what typical designers normally practice with drafting. Actually, with BIM technology, architects have been compared to the early builders who had built with modularity and derived a building practice from this. A strong de-engineering, de-constructing, component is felt mostly when executing a BIM project but need not be considered austere. Rather than what might be felt drafting, as linear mediums are not always as precise and as predictable (especially when floor plans can sometimes stack up incorrectly, a frustrating dilemma) the relative ease of execution, with BIM, can be felt as enlightening. When building vertically in BIM technology, a seamless, imperforated spatial continuation exists, and allows for more site and space specific views. This means there is no worry for selecting something off in space that may overlap an object in the foreground. With BIM this is never an issue.

The BIM revolution will be gradual, perceptions of this technology show that is slow to be accepted. The fact that this methodology is perceived as imposing reveals the paradigm shift but it isn’t at all unattainable, as far as I see it.

Written by Joseph J. Nicholson


This user is offline

View Website

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Seeking Typical Cost of BIM Consultant

General Discussion >> Revit ROI

Wed, Aug 3, 2011 at 12:16:16 PM

6

Is There a title of a Architect BIM Coordinator

General Discussion >> Revit Project Management

Mon, Jan 6, 2020 at 5:31:57 AM

2

What BIM course should I apply for? I already use BIM for 7 years.

Workflow & Implementation >> Training

Thu, Jun 15, 2017 at 6:43:58 AM

1

Seeking BIM Manager Position - Soon to be laid off from current position.

General Discussion >> Revit Project Management

Mon, Apr 16, 2012 at 10:12:57 AM

0

CAD Draftsmen and BIM Engineers

Workflow & Implementation >> Training

Mon, Jan 17, 2011 at 2:54:25 AM

0

Site Stats

Members:

2056486

Objects:

23074

Forum Posts:

152326

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 0.4074

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights