i have a front porch addition in phase 1 and a future mother-in-law apartment addition in phase 2. my main model has the design options for each addition set up to their proper phase and it works fine. i'm trying to get a linked site model to behave the same way. however, the topo surface shows a hole where the future pads will go??? how do i get the topo to show only phase 1?
|
This user is offline |
|
|
|
active
Joined: Mon, Sep 19, 2005
217 Posts
|
What I usually do is before you put any pads into the existing topo is to copy<paste align<same place. Do this in proposed phase. Then tab through till you find the existing topo and demolish it. You should have left a proposed topo to do all further work with.
-----------------------------------
Macca Sunshine Coast QLD Australia |
This user is offline |
View Website
|
|
|
Similar Threads |
Can the linked revit drawings preserved its phasing setting in master site plan? |
Revit Building >> Technical Support
|
Fri, Apr 4, 2008 at 8:58:29 PM
|
0
|
Phasing - Building Already Done but Dind't Set up Phasing |
Community >> Newbies
|
Tue, Dec 15, 2009 at 7:40:42 AM
|
1
|
Site and phasing troubles |
Revit Building >> Technical Support
|
Mon, May 24, 2010 at 4:59:58 PM
|
2
|
phasing |
Revit Building >> Technical Support
|
Tue, Oct 23, 2012 at 8:20:21 AM
|
6
|
Phasing moved to Visibilty/Graphic |
General Discussion >> Wishlist
|
Wed, Nov 18, 2009 at 4:11:56 PM
|
5
|
|
|
Site Stats
Members: | 2076344 | Objects: | 23116 | Forum Posts: | 152268 | Job Listings: | 3 |
|