active
Joined: Mon, Apr 7, 2014
0 Posts No Rating |
I am using Revit architecture 2014. Recently just started on Room layout package and other people in the office has been using Codebook and causing them a lot of pain. So I was made the guinea pig to try out Roombook.
Had a look at the youtube video and everything is great until I can't transfer the data into Revit Schedule as shown in the video. We try to avoid exporting data like Furniture and Equipment list into excel (prefer to have it as a schedule on a sheet in Revit). Mange to do as the video shown until she manage to have RB Furniture Elements and RB Wall Surface Net etc on her Revit but not me.
Been looking high and low but nobody seems to use roombook or have this issue.
Anyone been using roombook and manage to transfer the Roombook date into Schedule?
|
active
Joined: Mon, Apr 7, 2014
0 Posts No Rating |
Finally manage to get the data into schedule!!
So, basically, with the installation of the Roombook extension, there is a predefined schedule came with it wihich sits inside a folder named Roombook. (I basically just search the whole Drive C for Roombook Schedule) It is a project file. After opened it, it has all the predefined schedules (ie RB Furniture Elements, RB All Room Quantities)under Schedule/Quantities. Right click on each of it (depend with schedule you need in your project) and Copy to Clipboard. In your project, go to any plan view, go to Modify and click Paste from Clipboard. And Voila, get all the data in the schedule (Of course remember to check the Generate Project data per Material).
Hope it would help someone, I spent a day trying to figure this out.
|