RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

53 Users Online (52 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Revit Building >> Technical Support >> Revit 2011 - Curtain Wall doors on Schedule for correct level

Search this ThreadSearch this Thread | Page 1 of 1 |

Fri, Apr 20, 2012 at 2:21:11 PM | Revit 2011 - Curtain Wall doors on Schedule for correct level

#1

daxoliveira


active

Joined: Tue, Jan 11, 2011
1 Posts
No Rating


I have a 2 story curtain wall. The door on the first floor is showing up on the schedule for the correct level, no problems with it. There is a door on the second floor of the curtain wall, which goes out to a deck. This door is showing up on the door schedule as being on the first floor. I have changed the curtain wall's base constraint to be the second floor and adjusted the base offset for the wall base to still be on the first floor level. Both doors on first and second level still show up as being on the first floor in my schedule. How do I make each door show up on their correct levels in the door schedule?


This user is offline

 

Thu, Jun 7, 2012 at 1:22:49 AM | Revit 2011 - Curtain Wall doors on Schedule for correct level

#2

DavidBruinsma


active

Joined: Sun, Jun 3, 2012
13 Posts
5 Stars: 1 Votes


The only thing i can think off is to split the certain wall horizontally at the first floor level. That way the ground floor part of the wall and its doors will schedule via the ground floor, and likewise the first floor curtain wall door  SHOULD schedule as a First floor door.

 

Experiement and let me know if that works.

 

regards

David Bruinsma


This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Schedule curtain wall doors

Revit Building >> Technical Support

Mon, Mar 20, 2006 at 11:54:56 AM

0

Schedule curtain panel by level?

Revit Building >> Technical Support

Fri, Sep 2, 2016 at 4:40:25 PM

9

Storefront Doors in Door Schedule

Revit Building >> Technical Support

Wed, Sep 9, 2009 at 4:32:17 PM

9

Scheduling Curtain System doors - will not identify level

Revit Building >> Technical Support

Mon, Jan 11, 2010 at 6:40:59 PM

0

tagging curtain wall doors

Revit Building >> Technical Support

Mon, Jul 30, 2007 at 3:14:11 PM

7

Site Stats

Members:

2056212

Objects:

23069

Forum Posts:

152281

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 2.5511

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights