|
|
Home | Forums |
Downloads | Gallery |
News & Articles | Resources |
Jobs | FAQ |
| Join |
Welcome !
|
39 Users Online (38 Members):
Show Users Online
- Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM |
Forums
Forums >> Workflow & Implementation >> Training >> Video Tutorial and using Shared Parameters and Scheduling Door Swings
|
|
active
Joined: Thu, Mar 17, 2005
1231 Posts
|
Below is a link to a video tutorial on using a 'shared parameter' to schedule door swings > ie: RH LH. It would be nice if the door families 'out of the box' read the 'flip control' and managed the swing internally but it's not there. This is a solid manual work around. Some quality control checks must accompany this system however. Other than that, it is a good basic lesson on using 'shared parameters' to schedule any non 'out of the box' data about your families. key word being schedule). If you don't need to schedule it then you don't need it to be a shared parameter. http://www.youtube.com/watch?v=qRozIapb7O0
-----------------------------------
.
FULL 'DOWNLOAD ACCESS' to all 850+ CADclips videos for only $150
|
This user is offline |
View Website
|
|
|
active
Joined: Mon, Feb 18, 2008
251 Posts
|
Daryl, Good video as usual. Just a note though. You have the door swing designations wrong. For an office or standard room, if you are facing the door on the swing side and the handle is on the right, it's a right hand door. It would be a left hand reverse if it swings out of the room (a good example is a store room door that swings out into the corridor). In this scenerio even if the handle is on the right it would be designated by LHR. The difference between RH and LHR is important when specifying hardware. Many commercial locks are not reversible. You most likely knew this but I thought a new desinger/draftsperson may miss this subtle error. Thanks for contributing another video. John
|
This user is offline |
View Website
|
|
active
Joined: Thu, Mar 17, 2005
1231 Posts
|
Fair enough. Thanks for the clarification.
-----------------------------------
.
FULL 'DOWNLOAD ACCESS' to all 850+ CADclips videos for only $150
|
This user is offline |
View Website
|
|
|
Similar Threads |
Door parameters not scheduling or tagging in double door. |
Revit Building >> Technical Support
|
Mon, Sep 26, 2011 at 3:29:50 PM
|
5
|
Scheduling Door Material with yes/no Paramters |
General Discussion >> Revit Project Management
|
Fri, Dec 16, 2011 at 10:24:05 AM
|
7
|
Door swings in RCP |
Revit Building >> Technical Support
|
Thu, Jul 18, 2019 at 5:03:06 PM
|
1
|
creating double door with multiple swings |
Revit Building >> Technical Support
|
Fri, Oct 31, 2014 at 1:44:28 PM
|
2
|
shared parameters |
Revit Building >> Technical Support
|
Mon, Jul 10, 2006 at 9:16:17 PM
|
1
|
|
|
Site Stats
Members: | 2056642 | Objects: | 23074 | Forum Posts: | 152327 | Job Listings: | 3 |
|