RevitCity.com Logo

Home  |  Forums  |  Downloads  |  Gallery  |  News & Articles  |  Resources  |  Jobs  |  FAQ  |  SearchSearch  |  Join  |  LoginLogin

Welcome !

66 Users Online (65 Members): Show Users Online - Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM

 

Forums

Forums >> Revit Building >> Technical Support >> Scope of Work Schedule (room reference tag)

Search this ThreadSearch this Thread | Page 1 of 1 |

Mon, Jul 13, 2009 at 8:01:06 AM | Scope of Work Schedule (room reference tag)

#1

shadow7


active

Joined: Thu, Mar 17, 2005
11 Posts
5 Stars: 1 Votes


I need a method that will allow me to craft a scope of work within REVIT that can be exported or linked to an Excel spreadsheet or directly copied into Word report for further use of information.

Each item would be scoped using a noteblock or keynote tag, so I can show the item reference on the drawing.  The item reference must able to reference the room is placed within, similar to a door tag.

Would this best performed from or with what tag, note block or keynote?

Brainstorm: Revit Excel Based / Generated Tag or Note

Or a Keynote that recognizes what room it is in - Room Reference

Room Number Room Name

Item# Floors Description Cost

Item# Walls/Col. Description Cost

Item# Windows Description Cost

Item# Doors Description Cost

Item# Electrical Description Cost

Item# HVAC Description Cost

Item# Plumbing Description Cost

Item# Spec.Const. Description Cost

Item# Misc. Description Cost

 Thanks.


This user is offline

 

Search this ThreadSearch this Thread | Page 1 of 1 |



Similar Threads

Thread/Thread Starter

Forum

Last Post

Replies

Making a Room Tag that will show a Calculated Value from a Room Schedule.

Revit Building >> Technical Support

Tue, Jan 25, 2011 at 5:32:37 PM

5

How do I combine fields in a note block with fields in a room schedule?!?

Revit Systems >> Technical Support

Thu, Mar 4, 2010 at 3:51:58 PM

2

Tag room schedule key info

Revit Building >> Technical Support

Wed, Sep 11, 2013 at 11:13:01 AM

1

automating door schedule ( From room # To Room #)

Workflow & Implementation >> Training

Thu, Jun 20, 2019 at 2:14:07 PM

1

Abbreviating Room Tag Names vs. Schedule

Revit Building >> Technical Support

Thu, Sep 1, 2011 at 2:05:14 PM

4

Site Stats

Members:

2057543

Objects:

23076

Forum Posts:

152250

Job Listings:

3

Sponsored Ads

Home | Forums | Downloads | Gallery | News & Articles | Resources | Jobs | Search | Advertise | About RevitCity.com | Link To Us | Site Map | Member List | Firm List | Contact Us

Copyright 2003-2010 Pierced Media LC, a design company. All Rights Reserved.

Page generation time: 1.0662

Login

User Name:

Password:

Remember Me  

Forgot Password?

Search Forums

Advanced Search

Search Forums

Advanced Search


Clear Highlights


Clear Highlights