|
|
Home | Forums |
Downloads | Gallery |
News & Articles | Resources |
Jobs | FAQ |
| Join |
Welcome !
|
93 Users Online (91 Members):
Show Users Online
- Most ever was 626 - Mon, Jan 12, 2015 at 2:00:17 PM |
Forums
Forums >> Revit Building >> Technical Support >> Counting
|
|
active
Joined: Tue, Jan 17, 2006
41 Posts No Rating |
I can't find how to use logical statements in my schedules. A standard swing door frame is 11", but a standard rollup frame is 8" and a full wall panel is 20". Wall panel count will equel "wall length - ((rollup width + 1'-4"ollup Count)+(swing width + 1'-10"*swing Count))*12/20". I need one more correction for custom frames,( maybe 20 or 30 a building) that won't work with a standard size. A simple if then statment. It must be in my syntex, and my inability to search help files and forums.
|
This user is offline |
|
|
|
active
Joined: Mon, Oct 8, 2007
57 Posts
|
I'm not entirely sure what you're trying to calculate; maybe the smilies are throwing me off, but search for "Valid Formula Syntax and Abbreviations" in the help menu.
|
This user is offline |
|
|
active
Joined: Tue, Jan 17, 2006
41 Posts No Rating |
Sorry bout the smiles don't know how to do them either buut your search gave me Conditional Statements in Formulas never got the "if swing" part but was able to use the typical door width to make the distinction. Now I am stuck with blue text? Don't understand why "if(Model=System 500)" does not generate a yes or no condition, but "if(Door Width=3' 2"" does? Any hint? The error is that "System 500" is not a valid schedule feild, but that is the model of the swing doors.
|
This user is offline |
|
|
active
Joined: Tue, Oct 9, 2007
285 Posts
|
The problem is that Revit understands a string of text to be a parameter not the actual condition. Basically you cant use text parameter outputs in formulas. If you want to use the output of a parameter in another formula it needs to be numeric of some kind (length, integer, etc). There are a bunch of a different ways that you can address this. Basically it comes down to useing another parameter that you set in line with the model #. You may want to create one called "Model #" that is just an integer or numberical paramete; set that to "500" and then use your schedule formula to search for the # nt the text string. If anybody has figured out a way to use text paramter output in formulas I would love to hear it. I think that there might be some upgrades to the formulas and paramters in 2009 but I dont know if that is one of them. On the bright side you should be able to string multiple parametters outputs into one tag in 09.... HTH Nick
|
This user is offline |
View Website
|
|
|
Similar Threads |
walkthrough counting numbers on the right top of the image |
General Discussion >> Revit Project Management
|
Fri, Sep 12, 2008 at 6:31:39 PM
|
0
|
Revit double counting objects in Schedule |
Revit Structure >> Technical Support
|
Mon, Apr 13, 2009 at 1:58:19 PM
|
10
|
Counting Mullions |
Revit Building >> Technical Support
|
Mon, May 12, 2008 at 1:33:35 PM
|
0
|
Ceiling Material Takeoff |
Revit Building >> Technical Support
|
Mon, Feb 12, 2007 at 5:04:10 PM
|
0
|
Window Schedule: "Count" not counting... |
Community >> Newbies
|
Tue, May 31, 2011 at 3:29:57 PM
|
5
|
|
|
Site Stats
Members: | 2057667 | Objects: | 23076 | Forum Posts: | 152250 | Job Listings: | 3 |
|